CONSTRUCTION TIPS
Pre-Delivery Considerations Foundation The Dry-In Schedule Subfloor Construction Porch / Deck Construction Log Wall Erection Second Floor System Roof System Installation Gable / Dormer Exterior Package Exterior Doors and Windows Exterior Snow Blocking Exterior Fascia Installation Subfloor Band Siding Installation Interior Walls and Log Settling Interior Stairs A Note About Log Settlement
Foundation
The Dry-In Schedule Subfloor Construction Porch / Deck Construction Log Wall Erection Second Floor System Roof System Installation Gable / Dormer Exterior Package Exterior Doors and Windows Exterior Snow Blocking Exterior Fascia Installation Subfloor Band Siding Installation Interior Walls and Log Settling Interior Stairs A Note About Log Settlement
Conventional Roof Systems Finished Roofing Exterior Preservative Application Electrical Plumbing Heat and Air Conditioning Interior Coverings For Walls and Ceilings Interior Staining Fireplace Installation Cabinets Finished Flooring Finish Labor Guttering Maintenance
Copyright© 2008 Natural Element Homes of The Carolinas "Independently Owned Building Consultant of Tenneessee Log and Timber Homes"